MINIMIZING YOUR COSTS IN COMPRESSED AIR .

Energy savings in compressed air.

We reduce energy consumption in your compressed air system and optimize your system. We do this independently.

Banner_2-2

Trending topics

The only independent advisor in the Netherlands.

Compressed air is one of the most expensive energy carriers in industry and is used extensively in almost every industry.

  • Independent advice
  • Assist our clients with their compressed air issues
  • Energy reduction of your compressed air system

Our clients

Our mission is to ensure the lowest achievable energy costs for your compressed air system.

We accomplish this by assisting our clients to save energy in the generation and use of compressed air with existing resources and existing available data. We do this by increasing the efficiency of your compressed air system.

Saving68%
Average improvement in cost54%

What our clients say

We as Twence have several compressed air stations that are due for replacement after many years of loyal service. The momentum to look critically at the air consumption and the current design and therefore I asked WeDu to assist us in this as an independent consultant.

The added value is that they themselves have years of experience in the compressed air world and know the market well.

WeDu guided us through the air consumption mapping, specification writing, tendering and bid evaluation.

Throughout this entire process, I have come to know WeDu as knowledgeable, critical, independent, flexible and decisive. Therefore, thank you for the pleasant cooperation.

Rob de Bot

Technical Project Manager

Jan-Willem de Fockert asked me to articulate our experiences with WeDu.

The relationship with Jan-Willem goes back about 10 years. 3 years ago we were in contact to optimize our compressor installation.

After years of running the installation with virtually no problems, the attention for the compressed air system waned. After contacting Jan-Willem, Frits and Patrick, we started looking together at the operation of the system and looked for opportunities to achieve savings.

We ourselves had already placed some valves in the air network, so that only the section that was in operation was supplied with compressed air.

These minor adjustments eliminate potential leaks.

We also explored options for saving energy in a smart way with the available compressors. This yielded great results.

Now we are in the process with WeDu to replace the dryers. WeDu helps us ask the right questions towards the suppliers. We also discuss together the options offered by suppliers.

WeDu used to work only for the Wanssum production site of Cementbouw/VVM, now they are also active for the production sites in Antwerp and Rieme.

We have been working with Wedu for several years now in a pleasant casual manner and hope that this cooperation will continue for years to come.

Rolf Rutten

Main production

Through this way I would like to thank you for the effort made to come up with a good and very accurate specification.

You have looked beyond just the needed replacement of the failed compressor in preparing this Spec.

As a result, we are moving as a company to a better plan of two smaller compressors, improving the reliability of the plant and achieving a reduction in energy with this.

Of course, this is also what I hired you for, but I want to compliment you through this way.

Also because in addition to knowledge, cooperation there was a fine collaboration with a fine approachable communication.

Henk Vlas

Manager of Technical Maintenance

Wedu performed measurements for us over a three-week period.

For this purpose, several measuring cases were placed in the compressor room, at the decentralized buffer tank and at several critical points in the pipeline network.

The measurement results and findings are conveniently recorded in a clear report.

This study showed that replacing one or more compressors is not necessary to solve the control gap.

By adjusting the control sequence of the compressors, only a new control box is required.

This solution resulted in significant cost savings over compressor replacement.

Martin Kraster

Project Engineer